Dominion Atlantic Railway Sissiboo River Bridge 8 February 2012 11:27am
Six days after the crane collapsed.
The time is a few minutes after high tide.
This photograph was taken with the camera about 900m [2900 feet] from the scene.
Dominion Atlantic Railway Sissiboo River Bridge 8 February 2012 11:27am
This pier (above) was located under the curved track at the west end of this bridge.
Note the tapered design of the top of this pier. The purpose of this taper
was to raise the outer rail slightly above the inner rail. This feature, known
as superelevation or cant, is a standard design of any curved railway track.
|
W3C HTML Validation Service http://validator.w3.org/ |
W3C CSS Validation Service http://jigsaw.w3.org/css-validator/ |