Dominion Atlantic Railway Sissiboo River Bridge 26 January 2012 12:20pm
Two workmen are on the top of a girder, making preparations for lifting it.
Directly below them can be seen the barge that has recently been working
at the Bear River bridge. A few days ago it was transferred here, and is now
supporting a cherry picker used to lift the workmen to the top of the girder.
The time is about one hour before high tide.
|
W3C HTML Validation Service http://validator.w3.org/ |
W3C CSS Validation Service http://jigsaw.w3.org/css-validator/ |